Skip to content

Files and Communication

Drive, Folders, Files & Versions

How GreenVee stores uploaded files — the Drive structure, folder hierarchy, file version history and safety checks, and attaching files directly to work items.

The Drive is GreenVee’s file storage system. Think of it like a company-wide shared folder, with one important extra feature: every project also has its own scoped view of that storage.

You can access the Drive in two ways:

View What you see
Global Drive All files across the entire organisation
Project Drive Only files that belong to a specific project (found on the project’s Drive tab)

Files inside the Drive are organised into Folders. Folders can be nested inside other folders, so you can build a hierarchy that matches your team’s workflow. From a folder’s menu you can rename it, move it into another folder, or delete it.

Every Drive (the Global Drive, and each project’s Drive) has one top-level root folder, which GreenVee creates automatically the first time you open that Drive. The root folder is protected: it can’t be renamed, moved, or deleted, but you can still upload into it and create folders inside it.


A File is any uploaded file — a PDF, an image, a spreadsheet, a video, or any other format. The same file storage backs two different places a file can live:

A file can even do both at once: attach a file to a Task, Decision, or Takeaway that belongs to a project, and it also shows up filed in that project’s Drive.

Every file has:

  • Title — the display name shown in GreenVee
  • Original filename — the name the file had when it was uploaded
  • Kind — the file category: Image, Video, Audio, Document, Archive, or Other
  • Extension — the file extension (e.g. pdf), when known

The sidebar for a selected file also shows who created it, when it was created and last modified, and its unique ID.


Every time you upload a new version of the same file, GreenVee creates a File Version. The original upload is version 1; subsequent uploads add new versions while keeping all older ones intact. Open Versions from a file’s menu to see the full history, preview any past version, or restore it as the current version.

Each version tracks:

Field Description
Version label A name or number identifying this version (e.g. “v2 — client review”)
MIME type The technical file format (e.g. application/pdf)
Size File size in bytes
Upload status Where the upload is in its lifecycle: Pending, Uploading, Processing, Ready, Failed, or Deleted
Security scan status The result of GreenVee’s antivirus scan: Pending, Clean, Infected, or Error

A version can only be opened, previewed, downloaded, or restored once it’s Ready and the security scan comes back Clean. While a version is still processing or being scanned, those actions stay disabled. As an extra safety check, GreenVee also compares a file’s actual contents against its declared type, and corrects the recorded MIME type if the two don’t match. For a few file types (plain text, for example), GreenVee can’t verify the content this way — those versions are simply left as unchecked, which doesn’t block them from being opened once the antivirus scan is clean.

This means you always have a full history of changes, know whether a file is safe to open, and can restore an earlier version if needed.


Not every file needs to live in a Drive folder. A file can instead be attached directly to a Task, Issue, Decision, Takeaway, or a technical structure item, using the attach control on that item (a paperclip icon, or a Files button that opens the item’s own file list). Attached files go through the same versioning, MIME verification, and security scanning as Drive files — you’ll find them in that item’s file list rather than the Drive’s folder tree.

When you attach a file to a Task, Decision, or Takeaway that belongs to a project, GreenVee also places that same file into the project’s Drive, under a matching Tasks, Decisions, or Takeaways folder — so it shows up both on the item and in the project’s Drive folder tree. Files attached to an Issue, to a documentation note on a technical structure item, or directly to a technical structure item itself, stay only on that item and aren’t filed into the Drive.