Materials, Equipment, Warehouse
Materials, Equipment & Warehouse
Overview of how GreenVee manages materials, equipment, stock, and warehouse operations.
This section covers everything related to physical resources on a project: the products you buy, the equipment you own, and the warehouse operations that move them around.
What’s in this section
Section titled “What’s in this section”| Page | What it covers |
|---|---|
| Goods Catalogue | The three-level catalogue — Good Type, Good, and Variant — that defines every product in the system |
| Specifications | How technical attributes (diameter, weight, voltage) are defined and stored against Variants |
| Warehouses & Stock | How Warehouses hold inventory and how Stock Movements track every inbound and outbound change |
| Procurement | Procurement Requests and Purchases — from “we need this” to “we ordered this” |
| Good Usage on Tasks | How materials are linked to individual Tasks on a project |
| Equipment | Physical owned equipment — machines, vehicles, tools — and how they are categorised |
| Materials vs Goods | Plain-English explanation of why the system uses both terms for the same thing |
How the pieces fit together
Section titled “How the pieces fit together”A Good Type (e.g. “Pipe”) groups related Goods (e.g. “Steel Pipe”). Each Good can have multiple Variants (e.g. “Steel Pipe DN100”, “Steel Pipe DN200”) — one Variant per distinct SKU.
When a project needs materials, engineers raise Procurement Requests against specific Variants. Those requests become Purchases (buy externally) or are fulfilled from Stock (take from the warehouse). Every material consumed on a Task is recorded as a Good Usage entry, giving a complete audit trail from catalogue to installation.
Equipment follows a parallel path: an Equipment Unit category groups individual Equipment records. Bookings and time-based usage are handled in the Time and Calendar section.