Skip to content

Materials, Equipment, Warehouse

Materials vs Goods

Plain-English explanation of why GreenVee uses both "Material" and "Good" — and why they mean the same thing.

If you have moved between different screens in GreenVee and noticed that some pages say “Materials” while others say “Goods”, you are not missing something. They are the same thing.

“Material” and “Good” are two labels for the same underlying data.

There is no separate “Materials” database and “Goods” database. Whichever door you came through, you are looking at the same records.

The two terms come from different professional vocabularies:

Label Who uses it naturally Context
Material Engineers, field workers, construction professionals “What materials do we need for this installation?”
Good Procurement teams, finance, supply chain “Raise a purchase order for this Good.”

GreenVee serves both audiences. Rather than force one group to learn the other’s vocabulary, the system uses whichever term makes more sense in each context. The data behind both is identical.

Whether a screen calls it “Material” or “Good”, the structure is always:

Good Type (= Material Category)
└── Good (= Material)
└── Variant (= a specific SKU of that Material)
Term in this context What it means
Good Type / Material Category The top-level grouping (e.g. “Pipe”, “Cable”)
Good / Material The product entry in the catalogue (e.g. “Steel Pipe”)
Variant A specific version with its own SKU and specs (e.g. “Steel Pipe DN100”)

When the system asks you to select a “Material” on a Task, it is asking you to pick a Variant. When procurement asks you to approve a “Good” on a Purchase, it is referring to the same Variant in the catalogue.

Screen / Feature Label used
Task assignment, field work views Material
Goods Catalogue, Variants Good
Procurement Requests, Purchases Good
Stock Movements Material or Good (depends on context)
Technical Structure required items Good
  • Material = Good. Same records. Different label.
  • Both terms refer to the three-level structure: Good Type → Good → Variant.
  • For detailed field definitions, see the Goods Catalogue page.