Procurement

How Procurement Requests express material demand, and how Purchases turn that demand into formal purchase orders.

Procurement in GreenVee has two distinct records: a Procurement Request (the internal demand) and a Purchase (the formal order placed with a supplier). They work in sequence — a need is identified, then actioned.

A Procurement Request is an internal record that says: “we need this material for this task.” It does not automatically place an order — it signals demand that the procurement team then acts on.

Every Procurement Request is one of two types:

Type What it means
STOCK The material already exists in the warehouse — pull it from stock
PURCHASE The material needs to be bought externally — create a Purchase
Field What it means
Variant Which specific product is needed (the SKU-level item)
Project Which project this demand belongs to
Type STOCK or PURCHASE — how this demand should be sourced
Quantity How many units are needed
Currency Currency used for this request’s pricing context
Address Delivery address for this request
Due Date When the material is needed on site
Earliest Date The earliest date the material can be delivered or picked up
Technical Structure Good Optional link to the Required Good entry on a Technical Structure node, tying the demand to a physical installation point

A Purchase is a formal purchase order for a physical product on a project. It is created when a Procurement Request of type PURCHASE is actioned, or directly by the procurement team.

A Purchase moves through a much richer set of states than a simple approval flow. The main path runs from drafting through ordering, delivery, inspection, and payment, with several states covering exceptions:

State Meaning
Draft Being prepared, not yet sent to a supplier
Requested Submitted for internal approval
Approved Approved internally, ready to be placed with a supplier
Rejected Turned down during internal approval
Ordered Sent to the supplier, awaiting confirmation
Order Confirmed Supplier has confirmed the order
Partially Delivered Some, but not all, of the ordered quantity has arrived
Delivered The full ordered quantity has arrived
Under Inspection Delivered goods are being checked before acceptance
Accepted Inspection passed — goods are accepted into the project
Rejected at Inspection Inspection failed — goods did not meet requirements
Invoiced The supplier’s invoice has been received
Paid The invoice has been paid
Cancelled The purchase was called off before completion
Returned Accepted goods were later sent back (wrong item, damaged, etc.)
Disputed A problem exists that is being resolved before the order can close
Expired The purchase was not actioned in time and lapsed
Field What it means
Title A descriptive name for the purchase order
Purchase Number A user-facing reference number for the order
State Current status (see table above)
Project Which project this purchase is for
Variant The specific product being purchased
Quantity Number of units ordered
Delivered Quantity Number of units actually delivered so far
Returned Quantity Number of units sent back
Unit Price Net price per unit from the supplier
Currency Currency the prices are quoted in
Tax Rate Applicable tax percentage
Discount Discount percentage applied to the order
Additional Charges Extra charge percentage applied on top (e.g. shipping)
Key Dates Requested, ordered, delivered, invoiced, paid, and cancelled dates
Engineer defines Required Good on Technical Structure node (Variant + quantity)
→ Procurement team raises Procurement Request (type: PURCHASE)
→ Procurement team creates Purchase and sends to supplier
→ Supplier delivers goods → Purchase moves to Delivered
→ Purchase moves through Inspection to Accepted
→ an inbound Stock Movement updates warehouse inventory

The Procurement Request stays on record throughout, linking the original demand from the project plan all the way to the goods in the warehouse. See Warehouses & Stock for how Stock Movements update on-hand quantity.