Guides
Engineer/technician
You plan what a project builds technically, which components it needs and which requirements they must meet.
Who you are
Section titled “Who you are”You are a planner, designer or technical project engineer. You structure the plant, define specifications and prepare procurement.
Your questions
Section titled “Your questions”- Which components does the plant consist of?
- Which specifications must each component meet?
- Which material from the catalog fits?
- What has to be ordered when?
Your apps & views
Section titled “Your apps & views”- In the project view, the „Engineering“ tab with the technical structure (Engineering) and the „Beschaffung“ (Procurement) tab (Procurement).
- „Arbeitsbereich“ (Work area) and „Drive“ for your tasks and drawings (Work area, Drive).
- Stammdaten (Master data) – Material catalog and Equipment catalog.
- Workmanagement – My tasks and My issues.
Your rhythm
Section titled “Your rhythm”- Daily: My tasks and My issues (Start of the day); work on the technical structure.
- Weekly: align the procurement status in the „Beschaffung“ tab with procurement.
- As needed: add new components to the material catalog (Build the material catalog); hand over to procurement (From engineering to order); deliver documents for gates (Gate decision & phase change).
Your typical workflows
Section titled “Your typical workflows”Your tools
Section titled “Your tools”Your KPIs
Section titled “Your KPIs”From the KPI library: Material costs, Procurement volume and the Cost breakdown of a project; for your quality work Quality gate pass rate and Open gate criteria.