Skip to content

Guides

Risks/Opportunities

In the „Risiken/Chancen“ tab you record risks and opportunities of the project, assess them and manage them with measures.

You make uncertainties visible and assess them in money. Then you plan measures and factor in their effect. The result is a realistic view of the possible damage and the possible success.

Tab „Risiken/Chancen“ (Risks/Opportunities). Within it you switch between the lists „Risiken“ (Risks) and „Chancen“ (Opportunities).

  • Possible / probable / actual damage: The possible damage is the maximum amount. The probable damage is weighted with the probability of occurrence and takes the measures into account. The actual damage is what really occurred. For opportunities, the same applies as success.
  • Preventive measure: Lowers the probability of occurrence of a risk or raises that of an opportunity, by a value in percentage points. It has its own costs.
  • Reactive measure: Takes effect when the event occurs.
  • Priority / Damage extent: A manual classification.

Two KPI cards at the top show „Risikoschaden“ (Risk damage) and „Chancenerfolg“ (Opportunity success), each as actual, possible and probable. Below, a risk/opportunity matrix displays all entries by probability of occurrence and possible value. The tables list the entries with probability of occurrence, mitigation, measure costs and status. Filter bar and sorting only apply to the table, not to the cards and the matrix. An entry opens with the sections „Info“, „Präventive Maßnahmen“ (Preventive measures) and „Reaktive Maßnahmen“ (Reactive measures). An employee can be assigned to each entry as owner; you can also filter by this.

Measure costs and occurred risks generate costs in the budget plan. The risk exposure appears on the Scoreboard. You see all measures and initiatives collected in the Project insights. At program level there is a separate view in the program risks.

Risk matrix · Risk → Measure