In the tab „Strategie“ you compare and prioritize all initiatives that are in planning.

This is where the decision is made which planned initiatives get priority. The tab places value, costs, strategic contribution and risk side by side and makes the priority visible.

Projekt & Portfolio › Portfolios › Portfolio › tab „Strategie“ (Strategy). It shows only initiatives in the phase „Planung“ (Planning).

  • Prio score: manually assigned rank. Higher means more important. Programs show the average of their projects.
  • Goal contribution: weighted yes answers to the active goal criteria in percent.
  • Risk contribution: weighted yes answers to the active risk criteria in percent. Higher means more risk.
  • Value / ROI: Value = expected revenues − total costs; ROI = value ÷ total costs × 100. Expected revenues are the order volume, for projects without an order the benefit.
  • P(damage) / P(success): probable damage from risks and probable success from opportunities.

On the left is the priority table, sorted by prio score. Columns: „Titel“ (title), „Wert / ROI“ (value / ROI), „Nutzen“ (benefit), „Auftragsvol.“ (order volume), „Ges.kosten“ (total costs), „Zielbeitrag“ (goal contribution), „Risikobeitrag“ (risk contribution), „Erfolg (%)“ (success), „P(Schaden) / P(Erfolg)“ (P(damage) / P(success)), „Dauer / Aufwand“ (duration / effort) and „Prio-Score“. Programs can be expanded. You change the order of the projects by dragging; Aligia then reassigns the ranks. A totals row shows sums or averages.

On the right are three charts:

  • „Prioritätsmatrix“ (priority matrix): bubble chart with goal contribution (x) and risk contribution (y). The bubble size shows the benefit. The most attractive initiatives are at the bottom right.
  • „Kosten vs. Nutzen“ (costs vs. benefit): on the left total costs and probable damage, on the right order volume or benefit and probable success.
  • „Radar“: compares total costs, order volume, P(damage), P(success), success and duration relative to the maximum of the selection.

If you select rows, the charts show only this selection. Without a selection they show everything. When you hover over a row, the initiative is also highlighted in the chart.

With „Optimieren (n)“ (optimize) you open the „Portfolio-Optimierung“ (portfolio optimization) for the selected projects. It shows schedule, projects, resources and material in context. Programs are skipped. Starting and applying optimization runs needs access to optimization.

Goal and risk contribution are based on the Criteria. Costs come from Financial performance, damage and success from Risks/Opportunities.

Evaluating & prioritizing a project idea