Reference & Data Model
Quality & gates
KPIs on gate criteria, K.O. criteria and specification matching; the basis is the segments' gate criteria and specification requirements.
| KPI | MP | PF | PG | PJ | Where | Meaning | Calculation | Display |
|---|---|---|---|---|---|---|---|---|
| K.O. criteria violated („K.-O.-Kriterien verletzt“ / „K.-O.“ / „K.-O.-Kriterium verletzt“) | ✓ | ✓ | PG: Scoreboard › „Projekt-Gesundheit“ › column „K.-O.“ (+ briefing); PJ: Scoreboard › „Risiko & Qualität“ (red card, max. 3 names) + briefing | Failed K.O. gate criteria | Number of gate criteria (via segments) with „Deal-Breaker“ = yes and state „Fehlgeschlagen“; PG: server per child project; PJ: count in the view | Count (pill) / red card with names; > 0 red | ||
| Open K.O. criteria („Offene K.-O.-Kriterien“) | ✓ | Project › Scoreboard › „Risiko & Qualität“ (link) | Deal-breakers still open | View: number of gate criteria with „Deal-Breaker“ = yes and state „Offen“ | Count link | |||
| Quality gate rate („Quality-Gate-Quote“) | ✓ | Project › Scoreboard › „Risiko & Qualität“ | Share of passed gate criteria | Server: 100 × number of gate criteria (via segments) with state „Bestanden“ ÷ number of all; ÷ 0 → 0 | % · tile | |||
| Open gate criteria („Offene Gate-Kriterien“) | ✓ | Project › Scoreboard › „Risiko & Qualität“ | Gate criteria not passed (open + failed) | Server: number of gate criteria with state ≠ „Bestanden“ | Count link; red > 0 | |||
| Spec matching verdict („Spec-Matching-Verdikt“) | ✓ | Project › Engineering › structure badges | Whether an assigned material variant fulfils the specification requirements | View: at least one violated requirement → „verletzt“ (violated); otherwise at least one unchecked → „ungeprüft“ (unchecked); no requirements → no verdict; otherwise „erfüllt“ (fulfilled) | Badge (no numeric value) |
- An open or failed gate criterion does not technically block the phase change (see Phase rules). The KPIs are a hint, not a lock.
- „Quality-Gate-Quote“ and „Offene Gate-Kriterien“ each have a second key on the server with an identical formula.