Skip to content

Guides

Engineering

In the „Engineering“ tab you describe what is technically built or delivered: as a tree of structure folders, component requirements and technical components.

Engineering links technical planning with procurement and execution. You record which components with which specifications are needed. Aligia checks whether the selected goods fulfil the requirements.

Tab „Engineering“. If the project does not yet have a technical structure, the tab shows the notice „Keine Tech-Struktur vorhanden“ (No tech structure available). With „Tech-Struktur hinzufügen“ (Add tech structure) you assign a structure.

  • Technical structure: The tree of the project. Several projects can use the same structure. An icon shows which projects those are.
  • Structure folder: An outline node, such as a plant, an assembly or a trade.
  • Component requirement: A placeholder with material type and technical requirements, i.e. minimum and maximum values.
  • Technical component: A concrete good from the material catalog with quantity and specifications.
  • Spec matching: The check whether the specification of a good fulfils the requirement.

The tree is on the left, the details of the selected item on the right. For a technical component you find the sections „Allgemein“ (General), „Technische Spezifikationen“ (Technical specifications), „Beschaffungsaufforderungen“ (Procurement requests), „Allokation“ (Allocation), „Dokumentation“ (Documentation) and „Verknüpfte Dateien“ (Linked files). With an allocation you assign goods to a task. This way the optimizer knows when which material is needed. With a procurement request you report the demand to procurement, with quantity, due date and earliest date. A requirement shows a status badge indicating whether matching components are assigned.

Material types and goods come from the Materials. Allocations link engineering with the Work area. Procurement requests appear in Procurement.

Technical structure (tool) · From engineering to order