Skip to content

Guides

OrgaFlow

OrgaFlow shows the project team as an org chart: project members and open resource demands as nodes, the hierarchy as connecting lines.

OrgaFlow is a graphical canvas for the project organization. Each node is a role in the project. Filled roles are project members with an employee. Unfilled roles are resource demands, that is, roles with required skills for which someone is still being sought.

  • Project, tab „Ressourcen“ (Resources): „Team“ switch. See Resources.
  • Projekt & Portfolio › Ressourcenplanung: „Organigram“ tab for the project selected on the left. See Resource planning.
  • Project member node: photo or initials, name and role. A colored border shows the current workload: green below 70 %, yellow up to 89 %, red above. The project manager is highlighted in gold.
  • Resource demand node: role and number of required skills.
  • Lines: They show who is assigned to whom in the project.
  • Toolbar at the top right: plus menu with „Neues Projektmitglied“ (new project member) and „Neuer Ressourcenbedarf“ (new resource demand). Two switches arrange the layout „von oben nach unten“ (top to bottom) or „von links nach rechts“ (left to right). There are also zoom controls and a minimap.
  • Build the hierarchy: Drag a line from one node to another. The target node becomes subordinate to the source node. Removing a line removes the assignment.
  • Open details: Double-clicking opens the detail panel. For members it has the tabs „Ressource“, „Updaten“, „Zuweisungen“ (Assignments) and „Skills“; for demands „Update“, „Zuweisungen“ and „Erforderliche Skills“ (required skills).
  • Context menu: Right-clicking offers „Bearbeiten“ (edit), „Zuweisungen“ and „Löschen“ (delete), and for members additionally „Skills“.
  • Resource matching: For a demand, you choose an employee. The dialog shows the required skills for comparison. After confirmation, the demand becomes a project member. This step cannot be undone.

In the project, the „Auslastungen“ (Workloads) switch takes you from the org chart directly to the project’s resource Gantt. In Resource planning, you select the project on the left from a list of the selected portfolio. The „Auslastung“ (Workload) tab there shows the same resource Gantt. Employees and skills come from the master data (Employees, Skills).