Status report editor
The status report editor captures the state of a project or program as a traffic-light rating in six areas, with comment, measures and decisions.
What it is
Section titled “What it is”A status report is a dated snapshot. It consists of a title, six ratings on a traffic-light scale (also called RAG: red, amber, green), each with a comment, plus free text for „Maßnahmen“ (measures) and „Entscheidungen“ (decisions). Reports are not overwritten. Each new report extends the series, so trends become visible.
Where it appears
Section titled “Where it appears”- Project, tab „Statusberichte“ (Status reports): Status reports in the project
- Program, tab „Statusberichte“: tabs „Eigene Berichte“ (own reports) and „Berichte der Planungsobjekte“ (reports of the planning objects), see Program reports
Structure
Section titled “Structure”| Area | What it covers |
|---|---|
| Gesamt (Overall) | Overall assessment |
| Arbeitsplan (Work plan) | Dates and progress |
| Kosten (Costs) | Budget and actual costs |
| Ressourcenaufwand (Resource effort) | Staff and workload |
| Risiko/Chance (Risk/opportunity) | Risk situation |
| Engineering | Technical state |
At the top is the „Aktueller Statusbericht“ (current status report) with all six traffic lights, the comment and a trend compared with the „Vorbericht“ (previous report). Below, a table lists all reports with their traffic lights.
How to work with it
Section titled “How to work with it”- Create: „Neuen Statusbericht erstellen“ (create new status report) opens the editor. You enter a title and, per area, an „Einschätzung“ (assessment: green, yellow, red) with a „Kommentar“ (comment). You also add „Maßnahmen“ and „Entscheidungen“.
- Read the trend: Aligia automatically compares each traffic light with the previous report and shows a trend arrow, e.g. „war Gelb“ (was yellow).
- Refine: Via „Bewertungsdetails öffnen“ (open rating details) you adjust a single assessment. You edit measures and decisions separately.
- View older reports: Double-clicking a table row opens an earlier report.
Specifics per view
Section titled “Specifics per view”In the program, „Berichte der Planungsobjekte“ shows the status reports of the associated projects side by side. The traffic lights feed into the Scoreboards: in the project as the status header, in program and portfolio as the „Status“ column. A red area makes the project briefing switch to „braucht Aufmerksamkeit“ (needs attention). The process is described in Creating a status report.