The status report editor captures the state of a project or program as a traffic-light rating in six areas, with comment, measures and decisions.

A status report is a dated snapshot. It consists of a title, six ratings on a traffic-light scale (also called RAG: red, amber, green), each with a comment, plus free text for „Maßnahmen“ (measures) and „Entscheidungen“ (decisions). Reports are not overwritten. Each new report extends the series, so trends become visible.

  • Project, tab „Statusberichte“ (Status reports): Status reports in the project
  • Program, tab „Statusberichte“: tabs „Eigene Berichte“ (own reports) and „Berichte der Planungsobjekte“ (reports of the planning objects), see Program reports
Area What it covers
Gesamt (Overall) Overall assessment
Arbeitsplan (Work plan) Dates and progress
Kosten (Costs) Budget and actual costs
Ressourcenaufwand (Resource effort) Staff and workload
Risiko/Chance (Risk/opportunity) Risk situation
Engineering Technical state

At the top is the „Aktueller Statusbericht“ (current status report) with all six traffic lights, the comment and a trend compared with the „Vorbericht“ (previous report). Below, a table lists all reports with their traffic lights.

  1. Create: „Neuen Statusbericht erstellen“ (create new status report) opens the editor. You enter a title and, per area, an „Einschätzung“ (assessment: green, yellow, red) with a „Kommentar“ (comment). You also add „Maßnahmen“ and „Entscheidungen“.
  2. Read the trend: Aligia automatically compares each traffic light with the previous report and shows a trend arrow, e.g. „war Gelb“ (was yellow).
  3. Refine: Via „Bewertungsdetails öffnen“ (open rating details) you adjust a single assessment. You edit measures and decisions separately.
  4. View older reports: Double-clicking a table row opens an earlier report.

In the program, „Berichte der Planungsobjekte“ shows the status reports of the associated projects side by side. The traffic lights feed into the Scoreboards: in the project as the status header, in program and portfolio as the „Status“ column. A red area makes the project briefing switch to „braucht Aufmerksamkeit“ (needs attention). The process is described in Creating a status report.