Skip to content

Reference & Data Model

Subtask (subtask)

A subtask is a checkable step in the „Checkliste“ (Checklist) of a task; in the interface it is called „Checkpoint“.

Subtasks break a task down into verifiable steps with an order and a done checkmark. They have no time position of their own, no effort and no assignment. (Data type: planning data, work plan)

Task › side panel › section „Checkliste“ (Checklist) › „Checkpoint hinzufügen“ (Add checkpoint; dialog „Neuer Checkpoint“).

Field Technical Type Required Meaning Notes
Name name Text yes Name of the checkpoint
Rank rang Number yes Order in the checklist Prefilled with the next number
Done check Yes/No yes Checkmark set
Description description Text no
Related to Kind Required On archive On delete
Task belongs to yes (in practice) archived along deleted along

Checking a subtask does not change the task status; „Erledigt“ (Done) on the task is set separately. Subtasks do not enter any KPI.

Task