Skip to content

Guides

Drive

The „Drive“ tab is the file storage of the project: folders, files and versions in one place.

Plans, contracts, minutes and records are stored directly with the project. You do not have to search a separate drive.

Tab „Drive“ in the project view. Each project has its own drive. The global Drive of the organization is located under Projekt & Portfolio › Drive (see Drive global).

  • Drive: The top-level storage area of the project.
  • Folder / File: The storage structure. Files are uploaded via drag-and-drop.
  • File version: Each file has a version history.

On the left you navigate through the folder structure, in the middle you see the content. On the right, a sidebar that you can show and hide displays the metadata of the selected item: type, size, status, creator, modification date and versions. For folders it shows the number of subfolders and files.

The global Drive uses the same interface. Files that are linked elsewhere, such as receipts of income or documents on technical components, belong to the project’s data set.

Drive (tool)