Risk-opportunity matrix

The risk-opportunity matrix shows all active risks and opportunities in a chart of probability of occurrence and potential value.

The matrix is a heatmap with dots. The horizontal axis shows the probability of occurrence („Eintritt (%)“), the vertical axis the „Möglicher Wert“ (potential value) in the project currency. Every active risk and every active opportunity is a dot. The background is colored in zones: green (low), yellow (medium) and red (high).

Above the matrix are two KPI cards: risk damage and opportunity gain, each with the potential, probable and actually realized amounts. Below follows the „Risiko-Chancen-Matrix“ with a legend for „Risiken“ (risks) and „Chancen“ (opportunities). To the right is a „Schweregrad“ (severity) slider. Below the matrix you switch between the „Risiken“ and „Chancen“ tables.

  • Read the dots: Hover over a dot. The tooltip shows type, probability of occurrence, potential value and the „Erwartungswert ohne Maßnahmen“ (expected value without measures).
  • Adjust severity zones: Severity is probability of occurrence times relative damage. With the two handles of the slider you move the boundaries between green, yellow and red. This changes only the color zones, not any data.
  • Filter: Filters and sorting apply to the tables below. The matrix and KPI cards always show the complete set.
  • Axes: The value axis scales automatically to the largest amount. The matrix thus fits small and large initiatives alike.

In the project, the dots come from its own risks and opportunities. In the program, the entries of all the program’s projects are merged. Inactive entries appear in neither matrix. The project Scoreboard additionally shows a compact „Risiko-Heatmap“ (risk heatmap). The process from risk to measure is described in Risk → measure.