Procurement request (good_procurement_request)

A procurement request (BAUF) requests a quantity of a good variant, either from stock or via purchase.

The procurement request is the project’s demand notification to warehouse and purchasing. It carries good, quantity, delivery address and dates and has a status. Planned material costs and stock movements arise from it. (Transactional data)

Project › tab „Beschaffung“ (Procurement) › table „Beschaffungsaufforderungen“ (columns „Typ“, „Gut-Variante“, „Menge“, „Fällig am“, „Frühstens am“, „Status“ — type, good variant, quantity, due on, earliest on, status), with filter and sorting (Guides › Procurement). „Neue Beschaffungsaufforderung“ (New procurement request) creates a manual request. In the tab „Engineering“ per component: cards „Beschaffungsaufforderungen“ with „Neue Beschaffungsaufforderung“ (Guides › From engineering to order). Status and dates can also be changed on the goods card in „Ressourceneinsatz“.

Field Technical Type Required Meaning Notes
Type type Selection yes „Lageraufforderung“ (stock request, stock) or „Einkaufsaufforderung“ (purchase request, purchase) From the component: proposal „Einkauf“ when the stock does not cover the remaining quantity
Status state Selection yes „Offen“, „Erledigt“, „Fehlgeschlagen“ (open, done, failed) Default „Offen“; badge blue/green/red
Good variant good_variant_id Reference yes Requested good (name, SKU, good type) Manual: search across all variants; component: fixed
Quantity quantity Number yes Quantity in base units; the table shows quantity × base quantity Component: proposal = bill-of-materials quantity
Address address Address yes Delivery address –
Due on due_date Date no Latest date
Earliest on earliest_date Date no Earliest date
Component technical_structure_good_id Reference no Origin from engineering Manually created: empty
Project project_id Reference no (always set) Project of the request

Not displayed: currency (set, not shown), optimization_run_id (system; marks Optimizer requests).

Related to Kind Required On archive On delete
Project belongs to no kept deleted along
Component belongs to no — reference cleared
Good variant belongs to yes — blocked (a variant with requests cannot be deleted)
Good usage has many — — kept (reference on the usage is kept)
Value Label Meaning Set by
open Offen Demand reported, not yet fulfilled Creation; warehouse (movement „ausstehend“, pending)
done Erledigt Material withdrawn or procured User; warehouse (movement „erfüllt“, fulfilled)
failed Fehlgeschlagen Cannot be fulfilled User; warehouse (movement „storniert“, cancelled)
┌──────────────────┐
Creation ─► OPEN „Offen“ ├──► DONE „Erledigt“
└────────┬─────────┘
└──────────────► FAILED „Fehlgeschlagen“
Transitions are free via the status selection field; the stock movement follows the request, with no copy-back.
Origin Marker Behavior
Manual (tab „Beschaffung“) without component Free choice of the good variant
Component (engineering) technical_structure_good_id set Quantity and type prefilled; appears on the component and on the good usage
Optimizer optimization_run_id set (system) When a run is applied, one open purchase request is created per proposed order; on the next apply, still-open Optimizer requests are replaced, user requests never
  • Purchase request: planned material cost item (net price × quantity, date = due on, otherwise earliest on, otherwise creation) which ends once a linked purchase is ordered or delivered. Actual costs and goods receipt are booked by the purchase.
  • Stock request: goods issue; while „Offen“ planned costs, on „Erledigt“ one-time actual costs „Materialkosten aus Lagerentnahme“ (material costs from stock withdrawal).
  • The status of the stock movement follows the request (Offen → pending, Erledigt → fulfilled, Fehlgeschlagen → cancelled); there is no copy-back from stock onto the request.
  • Without a project no cost booking, but a stock movement.
  • Details: Procurement, Material costs.

Number of procurement requests, purchase volume, open purchases – see Procurement.

Purchase · Good usage · Material