Skip to content

Reference & Data Model

Technical structure (technical_structure)

The technical structure is the tree of what a project builds: structure nodes with technical components and component requirements.

The Technical structure (technical_structure) bundles the technical planning of a deliverable. It is the root for Structure nodes, Technical components and Component requirements. A structure can be assigned to several projects; the engineering of all participating projects then shows the same tree. (Planning data)

Projekt › Engineering. Without an assigned structure the tab shows „Keine Tech-Struktur vorhanden“ (No tech structure available) and the button „Tech-Struktur hinzufügen“ (Add tech structure). The dialog „Technische Struktur zuweisen“ (Assign technical structure) lists all structures of the organization; via „+“ you create a new one. The header of the tree shows the title and the number of projects using the structure; a click lists the projects. Menu in the header: „Umbenennen“ (Rename). See Guides › Engineering and Guides › Technical structure.

Field Technical Type Required Meaning Notes
Name / Title title Text yes Name of the structure The dialog „Neue Struktur“ calls the field „Bezeichnung“, the dialog „Technische Struktur bearbeiten“ calls it „Titel“
Related to Kind Required On archive On delete
Project (project) has many no – Delete blocked as long as a project uses the structure (restrict)
Structure node (technical_structure_node) has many no – Nodes are deleted along (cascade)
  • On creation via the dialog, Aligia immediately creates a root node with the same name as the structure. The root node has no parent node, cannot be deleted and cannot be moved.
  • The assignment to the project is the project’s field technical_structure_id. It is set via „Tech-Struktur hinzufügen“. Assigning to a further project shares the tree, it does not copy it.
  • The tree is maintained exclusively in the interface; there are no rules that create structures automatically.

None. Engineering enters KPIs only through the spec-matching verdict (badge, no numeric value), see Component requirement and Ch. 13 › Quality.

Structure node · Technical component · Component requirement · Project · Guides › From engineering to order