Reference & Data Model
Assessment (state_assessment)
An assessment is the traffic-light value green/yellow/red with comment for one of the six areas of a status report.
Purpose
Section titled “Purpose”Every status report has exactly six assessments, one per area (type). The assessment carries the actual traffic-light value and the comment. The trend arises from the comparison with the same-area assessment of the previous report. (Data type: knowledge data, manual)
Where in the app
Section titled “Where in the app”Within the report: view „Aktueller Statusbericht“ (one row per area with traffic-light pill, trend and comment) and dialog „Bewertungsdetails öffnen“ (double-click on the row or link icon). In the report table every assessment appears as a colored dot. When creating the report, the six areas are arranged as tabs with „Einschätzung“ and „Kommentar“.
Fields
Section titled “Fields”| Field | Technical | Type | Required | Meaning | Notes |
|---|---|---|---|---|---|
| Area | type |
Selection | yes | one of the six areas (table below) | fixed on creation, not changeable |
| Assessment | value |
Selection | yes | Traffic light „Grün“ / „Gelb“ / „Rot“ | Default on creation: „Grün“ |
| Comment | comment |
Text (Markdown) | no | Reasoning; the previous report’s comment is shown for comparison | Displayed as „Kein Kommentar“ when empty |
| Trend | – (calculated) | Display | – | „war Grün/Gelb/Rot“ or „unverändert“ compared with the previous report | System, not stored |
The six areas
Section titled “The six areas”| Area (label) | Technical | What it covers |
|---|---|---|
| Gesamt | total |
Overall assessment |
| Arbeitsplan | workplan |
Dates and progress |
| Kosten | costs |
Budget and actual costs |
| Ressourcenaufwand | effort |
Staff and workload |
| Risiko/Chance | risk_chance |
Risk situation |
| Engineering | engineering |
Technical state |
Relations
Section titled “Relations”| Related to | Kind | Required | On archive | On delete |
|---|---|---|---|---|
| Status report | belongs to | yes | archived along | deleted along |
| Project / Program / Portfolio | belongs to | one of three (copy of the report level) | archived along | deleted along |
States
Section titled “States”| Value | Label | Color |
|---|---|---|
green |
Grün | green |
yellow |
Gelb | yellow |
red |
Rot | red |
| (missing) | Nicht bewertet | grey – display only, when a report has no assessment for this area |
Transitions are free: anyone whose grant at the project allows it can change the value in the dialog „Bewertungsdetails öffnen“ at any time.
Rules & automation
Section titled “Rules & automation”- Trend (system): severity green 0 < yellow 1 < red 2. Current value minus previous value: less than 0 → up arrow (green), greater than 0 → down arrow (red), otherwise „unverändert“. Without a previous report or with „Nicht bewertet“ on either side, no trend.
- Upward inheritance (system, display only): Program › „Berichte der Planungsobjekte“ and the portfolio status overview show per project (and per program in the portfolio) the six traffic lights of the last report. Hover shows „Bereich: Bewertung · Bericht vom Datum“ (area: assessment · report of date). Without a report the row stays empty. Nothing is copied or aggregated – only read.
- Previous report’s comment: if the traffic light differs from the previous report and that report had a comment, it is shown below the row.
Traffic-light dots, trend badges, status distribution (count of green/yellow/red), sorting „worst first“ and the briefings of project and portfolio read these values – see Status & traffic lights.
See also
Section titled “See also”Status report · Guides › Status report editor · Guides › Scoreboard