Skip to content

Guides

Drive & attachments

The Drive is the file storage with folders, versions and virus scanning. Attachments attach files directly to individual objects.

Aligia manages files in two places. The Drive is a folder storage like a network drive. Attachments are files attached directly to an object, such as a task or an issue. Both use the same technology: every file is scanned for viruses after upload before it can be opened or downloaded.

  • Project, tab „Drive“: separate storage per project. See Project Drive.
  • Projekt & Portfolio › Drive: organization-wide storage. See Drive (global).
  • Attachments: in tasks, issues and comments, documents, takeaways, and on structure folders and components of the technical structure („Verknüpfte Dateien“, linked files).
  • Folder tree on the left with „Dateien hochladen“ (upload files) and „Neuer Ordner“ (new folder).
  • List in the middle with the columns „Name“, „Typ“ (type), „Größe“ (size), „AV“ (virus scan), „Hochgeladen von“ (uploaded by) and „Geändert“ (modified).
  • Sidebar on the right with details of the selected item: status, security check, category, creator, date and the „Versionsverlauf“ (version history).
  • Upload: Drag files into the list („Dateien hier ablegen“, drop files here) or use the upload button.
  • Organize: The menu of a file or folder offers „Öffnen“ (open), „Umbenennen“ (rename), „Verschieben nach…“ (move to…), „Details“, „Versionen“ (versions), „Herunterladen“ (download), „ID kopieren“ (copy ID) and „Löschen“ (delete). Within the Drive you can also move entries by dragging.
  • Virus scan: The security indicator reads „Prüfung läuft“ (scan running), „Geprüft“ (scanned), „Prüfung fehlgeschlagen“ (scan failed) or „Infiziert“ (infected). Only a fully uploaded version marked „Geprüft“ can be opened and downloaded. Archives cannot be scanned for content („Keine Virenprüfung möglich“, no virus scan possible).
  • Versions: The „Versionsverlauf“ lists earlier states of a file. A version can be previewed or restored, provided it is scanned and ready. Currently no path creates new versions; older files may still carry earlier states. Uploading again, by contrast, creates a separate file.
  • Attachments: When creating an object, files are first „Vorgemerkt“ (queued) and uploaded after saving. „Entfernen“ (remove) only detaches the attachment; the file is kept.

Project Drive and global Drive are separate storages with the same operation. Attachments do not live in a Drive folder but belong to their object. You find them there in the „Dateien“ (Files) section. All members of the organization have access to files.