Cost event (cost_occurrence)

A cost event is a cost position that has actually been incurred; it is never changed or deleted, only reversed.

Cost events form the cost journal of a cost item (project data). Entered manually or posted by the system from time approval, ordered purchase, stock withdrawal, occurred risks and measures. All actual-cost KPIs sum up this table.

Detail view of the cost item › section „Kosten“ (Costs) › list „Ist-Buchungen“ (Cost events) with totals row, „+“ („Ist-Buchung hinzufügen“, Add cost event), context menu „Details“ / „Korrigieren“ (Correct). Double-click opens the dialog „Ist-Buchung“. See Guides › Financial performance.

Field Technical Type Required Meaning Notes
Amount cost_value Amount yes Incurred costs; negative for reversals locked after creation
Occurred on occurred_at Date yes Posting date locked after creation
Description description Text yes (may be empty) Label the only editable field of manual rows
Creation kind generated_from_system Yes/No yes „Manuell“ (manual, blue) or „Systemgeneriert“ (system-generated, grey) System
Source rule_key, source_id Reference no Rule and source row System; shown as text and link
Related to Kind Required On archive On delete
Cost item belongs to yes archived along deleted along
Project belongs to yes archived along deleted along
  • Journal principle: the server rejects every change to amount, date, cost item, project and source, as well as deletion. For manual rows only the description remains editable; system rows are completely locked.
  • „Korrigieren“ (for manual and system rows): creates a reversal record with a negative amount, the same date and the description „Storno: “; with „Korrigierte Buchung anlegen“ (Create corrected record) checked, additionally a new record with amount, date and description of your choice. Both rows are „Manuell“. The original stays.
  • Generating rules:
    • Time log approved → „Personalkosten aus Zeiterfassung“ (personnel costs from time tracking), hours × hourly rate (project member, otherwise employee); only on the first approval (Rule)
    • Purchase from „Bestellt“ (base class ordered or delivered) → „Materialkosten aus Einkauf“ (material costs from purchase), net amount; kept current, a void status („Storniert“, „Abgelehnt“, …) removes it (Rule)
    • Stock request „Erledigt“ (done) → „Materialkosten aus Lagerentnahme“ (material costs from stock withdrawal); kept current, „Fehlgeschlagen“ (failed) removes it (Rule)
    • Risk occurred (date and incurred damage set) → „Risiko eingetreten“ (risk occurred); once (Rule)
    • Risk/opportunity measure on an occurred risk or occurred opportunity → „Risiko-Präventionsmaßnahme (System)“, „Risiko-Reaktionsmaßnahme (System)“, „Chancen-…“; kept in sync when the costs or status of the measure change (Rule)

Actual costs (card, column, scoreboard, server KPI projectActualCosts), total costs (= actual costs), profit, ROI, material costs, personnel costs, cost breakdown by category, AC in EVM. See Budget KPIs, Value KPIs, EVM.

Planned cost · System-generated record · Guides › Log time → approve → project costs