Event (event)

An event is a meeting in the project, digital or on site, with time of day, attendees and a position in the work plan.

Events (acceptances, workshops, reviews) belong to the project and optionally to a segment. They have two time values: a position in the plan (placeholder, relative) and, once booked in the calendar, a fixed calendar slot. (Data type: planning data, work plan)

Project › „Arbeitsbereich“ (Work area) › „Neuer Termin“ (New event; placeholder position, „Geplant am“); calendar (booking with „Datum“, start, end); event view with attendees. See Guides › Work area.

Field Technical Type Required Meaning Notes
Title title Text yes
Type event_type Selection yes „Digital“ (digital) or „Physisch“ (physical)
Project project_id Reference yes Selectable in the calendar
Segment segment_id Reference no Parent segment
Planned on delta_ms Date (from relative position) yes Placeholder in the work plan Work area dialog; Gantt; system on optimizer commit
Date (booked) scheduled_at Date/time no Fixed calendar slot Only via the calendar dialog; a booked slot takes precedence over „Geplant am“
Start / End start_time / end_time Time of day yes Time window on the day Default 10:00–11:00 (work area) or 09:00–10:00 (calendar)
Meeting link meeting_url Text no For „Digital“ Calendar dialog shows it depending on type
Location address Address no For „Physisch“
Description description Text no

Mapping event ⇄ Project member with e-mail (email, from the employee) and status state: pending = Ausstehend (default), accepted = Akzeptiert, declined = Abgelehnt, tentative = Vielleicht. Add via „Teilnehmer hinzufügen“ (Add attendees); deleted along with the event or the member.

Related to Kind Required On archive On delete
Project belongs to yes archived along deleted along
Segment belongs to no kept reference cleared
Attendee (event_attendee) has many – archived along deleted along
  • Creation in the work area only in early phases; in the calendar at any time.
  • If an event ends before its start, the calendar moves the end to the following day.
  • The optimizer only positions the placeholder; it does not consider booked slots or attendee availability.

Segment · Project member