Status report (state_report)
A status report is a dated, non-overwritable assessment of a project or program in six areas.
Purpose
Section titled “Purpose”The status report regularly documents how a planning object is doing. It consists of a title, the creation time and exactly six assessments (see Assessment). Reports form a series; the most recent is the „Aktueller Statusbericht“ (current status report), the one before it the „Vorbericht“ (previous report). (Data type: knowledge data, manual)
Where in the app
Section titled “Where in the app”- Project › tab „Statusberichte“ – Guides › Status reports
- Program › tab „Statusberichte“ › „Eigene Berichte“ – Guides › Status reports (program)
- Create: plus icon „Neuen Statusbericht erstellen“ – Guides › Status report editor
- Open: double-click on a row or context menu „Details“; the title can be changed there.
Fields
Section titled “Fields”| Field | Technical | Type | Required | Meaning | Notes |
|---|---|---|---|---|---|
| Title | title |
Text | yes | Label of the report, e.g. „KW 38“ | changeable afterwards in the detail dialog |
| Created on | created_at |
Date | yes | Time of creation; determines order and previous report | System; the only date – there is no reporting period |
| Level | object_type |
Selection | yes | project / program / portfolio |
System, set from the context; not displayed but the basis of the assignment |
The six traffic lights of the report are not columns of this table but separate rows in state_assessment.
Relations
Section titled “Relations”| Related to | Kind | Required | On archive | On delete |
|---|---|---|---|---|
| Project | belongs to | one of three | archived along | deleted along |
| Program | belongs to | one of three | archived along | deleted along |
| Portfolio | belongs to | one of three | archived along | deleted along |
| Assessment | has many (6) | – | archived along | deleted along |
Rules & automation
Section titled “Rules & automation”- Creating generates six assessments. The dialog „Neuer Statusbericht“ creates the report and then one assessment per area with the chosen value (default „Grün“) and comment. Report and assessments are synchronized one after the other so that the assessments find their report.
- Sorting by
created_atdescending; the topmost report is the current one, the report before it the previous report for the trend. - Delete via context menu „Löschen“ with a confirmation prompt; the assessments are deleted along with it.
- No portfolio report in the interface. The schema and the dialog allow portfolio reports, but the portfolio has no „Statusberichte“ tab. Portfolios only see the reports of their programs and direct projects (see Assessment › Inheritance).
- No report is calculated. A program report is created manually only; project traffic lights are a basis, not a source.
The most recent report provides „Letzter Statusbericht“ (last status report) and the traffic-light dots in scoreboards and overviews; red lights color the project briefing („braucht Aufmerksamkeit“, needs attention). See Status & traffic lights.
See also
Section titled “See also”Assessment · Guides › Create a status report · Guides › Report program status