Skip to content

Reference & Data Model

Equipment booking (equipment_booking)

An equipment booking is a period created by the Optimizer in which a piece of equipment is occupied for an equipment usage.

The equipment booking occupies a device for the time window of a task. It serves the workload and conflict display for equipment. (Transactional data, system)

Projekt & Portfolio › Ressourcenauslastung (Resource workload) › switch „Equipments“: bars per device, utilization badge, conflicts (Guides › Resource workload). Also taken into account in the „Auswirkung“ (impact) of unavailabilities. There is no dialog for manual creation.

Field Technical Type Required Meaning Notes
Start start Date + time yes Start of the occupation System (Optimizer)
End end Date + time yes End of the occupation System (Optimizer)
Equipment equipment_id Reference yes Occupied device System
Equipment usage equipment_usage_id Reference yes Associated usage (task) System

Not displayed: plan, type, address, optimization_run_id (system; the Optimizer sets plan = true, type = usage, address = project address).

Related to Kind Required On archive On delete
Equipment usage belongs to yes kept deleted along
Equipment belongs to yes — deleted along
  • Created only when an Optimizer run is applied; earlier Optimizer bookings of the project are replaced in the process and removed on rollback (Optimizer commit).
  • Conflict „Doppelbuchung“ (double booking) for overlapping bookings of the same device, „Gebucht & Ausfall“ (booked & unavailable) for overlap with an equipment unavailability.

Equipment utilization % (booked hours ÷ calendar hours in the active period), conflicts – see Resources & workload.

Equipment usage · Equipment