Measure (risk_action)

A measure is a preventive or reactive action for a risk with an effect in percentage points, costs, status and assignee.

Measures make risk control traceable: a preventive measure lowers the probability of occurrence in advance, a reactive measure limits the loss on occurrence. Both have costs that flow into the probable loss and into the budget plan. (Data type: project world, transactional data)

Risk sheet › „Präventive Maßnahmen“ (Preventive measures) or „Reaktive Maßnahmen“ (Reactive measures) (table with „Titel“, „Maßnahmenkosten“, „Verringerung“, „Bezeichnung“, „Status“; the plus icon creates; double-click or „Details“ edits). Also from the row menu of the risk table („Maßnahme hinzufügen“) and in the gate sheet of a gate criterion. Overview of all measures of the project: Projekt › Projekt-Insights › Maßnahmen & Initiativen (Guides › Project insights).

Field Technical Type Required Meaning Notes
Title title Text yes Short label Required in the dialog
Type type Selection yes „Präventive Maßnahme“ / „Reaktive Maßnahme“ fixed by the section in the sheet
Status state Selection yes „Offen“, „Erledigt“, „Verworfen“ (open, done, discarded) Default „Offen“
Assignee assignee_id Reference (employee) no Responsible for implementation descriptive
Risk reduction by reduction_of_probability_in_pct Number (%) yes Reduction of the probability of occurrence in percentage points Default 0
Measure costs (edit: „Präventive/Reaktive Maßnahmenkosten“) cost Amount yes Estimated costs Currency of the risk
Measure description (table: „Bezeichnung“) description Text yes Detailed description multi-line

Not in the interface: cost_item_id (cost type, never set or displayed anywhere).

Related to Kind Required On archive On delete
Risk (risk) belongs to no archived along deleted along
Project (project) belongs to yes archived along deleted along
Gate criterion (gate_criteria) belongs to no kept reference cleared
Employee (employee, assignee) belongs to no kept reference cleared

A measure hangs either on a risk or on a gate criterion (then without a risk).

Open (OPEN) ⇄ Done (DONE) ⇄ Discarded (DISCARDED)

Free choice in the „Status“ field; no enforced sequence. Effect: Discarded counts in no sum (neither mitigation nor costs) and generates no costs. „Offen“ and „Erledigt“ count the same.

  • Sums per risk: „Verringerung insgesamt“ (total reduction) = Σ risk reduction (clamped to 0–100 % in the sheet, not in the tables), „Gesamtkosten“ (total costs) = Σ measure costs, each without discarded ones.
  • Delete via „Details“ › delete or the row menu.

Risk reduction by, measure costs, total costs of measures (project insights), share of the probable loss. See Risks & opportunities.