Reference & Data Model
Measure (risk_action)
A measure is a preventive or reactive action for a risk with an effect in percentage points, costs, status and assignee.
Purpose
Section titled “Purpose”Measures make risk control traceable: a preventive measure lowers the probability of occurrence in advance, a reactive measure limits the loss on occurrence. Both have costs that flow into the probable loss and into the budget plan. (Data type: project world, transactional data)
Where in the app
Section titled “Where in the app”Risk sheet › „Präventive Maßnahmen“ (Preventive measures) or „Reaktive Maßnahmen“ (Reactive measures) (table with „Titel“, „Maßnahmenkosten“, „Verringerung“, „Bezeichnung“, „Status“; the plus icon creates; double-click or „Details“ edits). Also from the row menu of the risk table („Maßnahme hinzufügen“) and in the gate sheet of a gate criterion. Overview of all measures of the project: Projekt › Projekt-Insights › Maßnahmen & Initiativen (Guides › Project insights).
Fields
Section titled “Fields”| Field | Technical | Type | Required | Meaning | Notes |
|---|---|---|---|---|---|
| Title | title |
Text | yes | Short label | Required in the dialog |
| Type | type |
Selection | yes | „Präventive Maßnahme“ / „Reaktive Maßnahme“ | fixed by the section in the sheet |
| Status | state |
Selection | yes | „Offen“, „Erledigt“, „Verworfen“ (open, done, discarded) | Default „Offen“ |
| Assignee | assignee_id |
Reference (employee) | no | Responsible for implementation | descriptive |
| Risk reduction by | reduction_of_probability_in_pct |
Number (%) | yes | Reduction of the probability of occurrence in percentage points | Default 0 |
| Measure costs (edit: „Präventive/Reaktive Maßnahmenkosten“) | cost |
Amount | yes | Estimated costs | Currency of the risk |
| Measure description (table: „Bezeichnung“) | description |
Text | yes | Detailed description | multi-line |
Not in the interface: cost_item_id (cost type, never set or displayed anywhere).
Relations
Section titled “Relations”| Related to | Kind | Required | On archive | On delete |
|---|---|---|---|---|
Risk (risk) |
belongs to | no | archived along | deleted along |
Project (project) |
belongs to | yes | archived along | deleted along |
Gate criterion (gate_criteria) |
belongs to | no | kept | reference cleared |
Employee (employee, assignee) |
belongs to | no | kept | reference cleared |
A measure hangs either on a risk or on a gate criterion (then without a risk).
States
Section titled “States”Open (OPEN) ⇄ Done (DONE) ⇄ Discarded (DISCARDED)Free choice in the „Status“ field; no enforced sequence. Effect: Discarded counts in no sum (neither mitigation nor costs) and generates no costs. „Offen“ and „Erledigt“ count the same.
Rules & automation
Section titled “Rules & automation”- Sums per risk: „Verringerung insgesamt“ (total reduction) = Σ risk reduction (clamped to 0–100 % in the sheet, not in the tables), „Gesamtkosten“ (total costs) = Σ measure costs, each without discarded ones.
- Delete via „Details“ › delete or the row menu.
Risk reduction by, measure costs, total costs of measures (project insights), share of the probable loss. See Risks & opportunities.
See also
Section titled “See also”Risk · Initiative · Gate · Cost event