Guides
Gantt
The Gantt shows initiatives, work plans and resources as bars on a timeline and is the most frequently recurring tool in Aligia.
What it is
Section titled “What it is”A Gantt chart represents work as bars over time. On the left is a table with the rows, on the right the timeline with the bars. Aligia uses the same Gantt for work plans, for multi-project overviews and for the workload of employees and equipment.
Where it appears
Section titled “Where it appears”- Project, tab „Arbeitsbereich“ (Workspace): The toggle „Zur Gantt-Ansicht wechseln“ (switch to Gantt view) / „Zur Listenansicht wechseln“ (switch to list view) switches between the list and the Gantt of the work plan. See Workspace.
- Project, tab „Ressourcen“ (Resources): The „Auslastungen“ (Workloads) switch shows a resource Gantt of the project members. See Resources.
- Program and Portfolio, tab „Gantt“: See Program Gantt and Portfolio Gantt.
- Projekt & Portfolio › Multiprojektboard: all programs and projects of a portfolio. See Multi-project board.
- Projekt & Portfolio › Ressourcenauslastung: workload with the sub-tabs „Mitarbeiter“ (Employees) and „Equipments“. See Resource workload.
- Projekt & Portfolio › Ressourcenplanung: „Auslastung“ (Workload) tab per project. See Resource planning.
- Optimizer: the „Zeitplan“ (Schedule) tab shows the result of an optimization.
Structure
Section titled “Structure”- Bar types: Program, Project, Segment, Work package and Task appear as bars. Milestone, Gate and Event are points in time without duration. Resource views additionally have employee, equipment and absence rows.
- Hierarchy: Bars are nested, e.g. Project › Segment › Work package › Task. Parent bars are derived from their children.
- Dependencies: Arrows connect the start or end of one element with the start or end of another (e.g. end → start).
- Timeline: You choose the time unit from „Tag“ (day), „Woche“ (week), „Monat“ (month), „Quartal“ (quarter) and „Jahr“ (year). There are also „Vergrößern“ (zoom in), „Verkleinern“ (zoom out) and „Zeitleiste an Projekt anpassen“ (fit timeline to project). A line marks „Heute“ (today); weekends are shaded at the fine time levels.
How to work with it
Section titled “How to work with it”- Select and edit: Double-clicking a bar switches it into edit mode. Handles for moving, resizing and connecting then appear.
- Move and resize: Tasks can be moved and their duration changed. Segments, milestones, gates and events can be moved. The change is saved immediately.
- Connect dependencies: Drag from the connection point at the start or end of one element to another. Remove a selected connection with the Delete key.
- Context menu: Right-clicking a bar or table row opens a menu. Projects and programs offer „Öffnen“ (open), other bars „Details“. There are also „Bearbeiten“ (edit), adding child elements and „Löschen“ (delete). In the table, „Im Chart anzeigen“ (show in chart) jumps to the bar. Tasks, milestones, gates and events show their usual own context menu.
- Zooming: Ctrl or Cmd plus mouse wheel zooms the timeline.
Specifics per view
Section titled “Specifics per view”| View | Mode |
|---|---|
| Project Workspace | Editable in „Initialisierung“ (Initialization), „Definition“ and „Planung“ (Planning), with relative days. From „Umsetzung“ (Execution) onward read-only with real calendar dates, because the schedule is then fixed by the optimizer. |
| Program, Portfolio, Multi-project board | Switch „Plan-Modus“ (Plan mode) / „Ist-Modus“ (Actual mode). Plan mode shows initiatives in planning and is editable. Actual mode shows real dates and is read-only. Non-matching projects appear greyed out in the program. |
| Resource workload, Resource planning, Project resources | Read-only. Rows per employee or equipment with workload in percent and daily load curve. In Resource workload, a notice shows resource conflicts from today onward: „Doppelbuchung“ (double booking), „Gebucht & abwesend“ (booked & absent) and, for equipment, „Gebucht & Ausfall“ (booked & outage). |
| Optimizer, tab „Zeitplan“ | Tasks can only be moved. Moving pins a start date for the next calculation instead of changing the plan directly. The context menu offers „Details“ and „Fixieren…“ (pin…); a line marks the „Zieltermin“ (target date). |