Skip to content

Reference & Data Model

Folder (folder)

A folder structures a volume as a tree; names are unique per level.

Folders form the storage structure of the Drive. A folder lives either in a parent folder or – without a parent folder – directly in the volume. The volume assignment is stamped in permanently; moving between volumes is impossible. (Data type: file data, manual)

Folder tree on the left of the Drive, button „Neuer Ordner“ (New folder); context menu with „Öffnen“ (Open), „Umbenennen“ (Rename), „Verschieben nach…“ (Move to…), „Details“, „Löschen“ (Delete). For a selected folder the sidebar shows „Dateien“ (Files) and „Unterordner“ (Subfolders) (count), „Erstellt“ (Created), „Geändert“ (Modified) and „ID“. – Guides › Drive & attachments

Field Technical Type Required Meaning Notes
Name name Text yes folder name („Ordnername“ in the dialog) unique among siblings on the same level
Parent folder parent_folder_id Reference no empty = top level of the volume changeable via „Verschieben nach…“ or drag and drop
Protected protected Yes/No yes protected folders only have „Öffnen“ and „Details“ in the menu System; the interface always creates folders unprotected
Created / Modified created_at / updated_at Date yes timestamps in the sidebar System
ID id Text yes copyable in the sidebar System
Related to Kind Required On archive On delete
Volume belongs to yes – deleted along
Folder (parent folder) belongs to no archived along deleted along
Folder (subfolder) has many – archived along deleted along
File has many – kept (but not readable, see File) deleted along
  • Unique names: Under the same parent folder (or on the top level) a name may only occur once; renaming or creating with an existing name fails („konnte nicht erstellt/umbenannt werden“ – could not be created/renamed).
  • Moving: The target must be a living folder of the same volume; not into itself, not into its own subfolders, not into the current parent folder. Flat volumes (attachments) allow no folders.
  • Deleting is final after a confirmation prompt („… wird mitsamt allen Unterordnern und enthaltenen Dateien gelöscht“ – … will be deleted together with all subfolders and contained files); deleted folders cannot be restored.
  • A folder has an archive date in the schema, but the interface does not offer archiving.

Volume · File