Material catalog

The Material catalog describes all goods your projects install or consume, in three levels. It also holds technical specifications and stock levels.

Engineering, procurement and warehouse work with the same articles. The catalog defines what an article is technically, what it costs and how much of it is in stock.

Stammdaten › Material-Katalog (Master data › Material catalog). The tree on the left has three levels.

Material category (e.g. cables)
└── Sub-material category (e.g. power cables)
└── Product (e.g. NYM-J)
└── Article (SKU, e.g. NYM-J 3×1.5 mm², 100 m)
  • Material category: a functional group. It can have subcategories and defines the technical specifications.
  • Product: a good with identifier, unit quantity and unit, plus the flag „Einkauf erforderlich“ (purchase required).
  • Article: the concrete, orderable variant with SKU, unit price (net), currency and stock data.

Specifications. On a material category you create technical specifications and group them into specification categories. Each specification has a data type (number, text, yes/no, selection) and, if needed, a unit. Subcategories inherit the specifications of their parent categories. The view separates inherited and local specifications. On the article you enter the values („Technische Daten“, technical data). The KPI „Spezifikationsabdeckung“ (specification coverage) shows how completely the values are maintained.

Stock. An article can be „Lagerfähig“ (stockable) and have stock tracking. You then maintain the minimum, target and maximum stock quantity as well as the procurement lead time in working days. Article receipts and article issues result in the „Aktuelle Lagermenge“ (current stock quantity). A bar shows the stock in relation to min / target / max. If the stock is too low, „Bestand kritisch“ (stock critical) appears.

Product view. The product shows the total stock, the articles below minimum, open orders and procurement requests.

In the Engineering tab you link articles to the project’s technical structure. Technical requirements are matched against the articles’ specifications. Orders and procurement requests are created in Procurement and appear here on the product. If you change a price or a specification, all projects that use the article see the change.

Building the material catalog · From engineering to order