Skip to content

Reference & Data Model

Gate (gate_criteria)

A gate is a checkpoint in the work plan with status Passed/Failed/Pending; as a deal breaker, a failed gate signals project abort.

Gates document decision points (e.g. approval of the planning). They carry status, deal-breaker flag, planned day and time window and can bundle preventive and reactive measures. Technically a gate does not block a phase change. (Data type: planning data, work plan)

Project › „Arbeitsbereich“ (Work area) › „Neues Gate“ (New gate); gate view (double-click) with status selection, deal-breaker toggle, „Präventive Maßnahmen“ (Preventive measures) and „Reaktive Maßnahmen“ (Reactive measures); scoreboard „Risiko & Qualität“ (Risk & quality). See Guides › Gate decision & phase change.

Field Technical Type Required Meaning Notes
Title name Text yes
Segment segment_id Reference yes
Status state Selection yes Check result Default „Ausstehend“ (Pending); see States
Project abort on failure (deal-breaker gate) deal_breaker Yes/No yes Failing means project abort Red icon in the gate view („Ist kein Projectabbruch-Gate“ when no)
Planned on delta_ms Date (from relative position) yes Planned day As for milestone; system on optimizer commit
Not before / Not after not_before_date / not_after_date Date no Time window for the optimizer
General description description Text no

Preventive (prevention) and reactive (reaction) measures are Risk measures or Opportunity measures with a reference to the gate. When the gate is deleted, the measure is kept and only loses its gate reference.

Related to Kind Required On archive On delete
Segment belongs to yes archived along deleted along
Risk measure / Opportunity measure has many – kept reference cleared
Value Label Meaning
open Ausstehend Not yet decided (default)
passed Bestanden
failed Verfehlt For a deal breaker: red warning in the project and program scoreboard

Freely selectable in any order; set manually.

  • Creation only in early phases.
  • A failed deal-breaker gate does not trigger a phase change; it appears as a warning (Status).
  • On optimizer commit, pending gates move with the plan; passed ones keep their date (Optimizer commit).

K.O. criteria violated (deal_breaker ∧ failed), open K.O. criteria, quality gate rate (share of passed), open gate criteria (≠ passed): Quality & gates.

Project › States · Milestone · Guides › Lifecycle bar