Time entry (time_entry)
A time entry is a from–to time span within a time log.
Purpose
Section titled “Purpose”Time entries carry the actual hours. A time log can have several time entries, for example before and after the lunch break. Their sum is the „Erfasste Arbeitszeit“ (logged working time) and the actual effort of the task. (Transactional data)
Where in the app
Section titled “Where in the app”Dialog „Zeiterfassung“ › section „Zeitenbuchungen“ (list of spans, „+“ opens a popover with „Start“, „Ende“ and the duration; the trash icon deletes). When creating („Neue Zeiterfassung“), the spans are collected as a draft and saved together. Also in the week view as day cells (Guides › Time tracking).
Fields
Section titled “Fields”| Field | Technical | Type | Required | Meaning | Notes |
|---|---|---|---|---|---|
| Start | start_time |
Time | yes | Start of the span | Default: now |
| End | end_time |
Time | yes | End of the span | Default: now + 1 h; end before start = across midnight (+ 24 h) |
| Time log | time_log_id |
Reference | yes | Owning header |
Shown, not stored: duration of the span.
Relations
Section titled “Relations”| Related to | Kind | Required | On archive | On delete |
|---|---|---|---|---|
| Time log | belongs to | yes | kept | deleted along |
Rules & automation
Section titled “Rules & automation”- A time entry cannot be added to, changed in, removed from or moved into an approved time log („time entries of an approved time log are frozen“). See Locks.
- If a time log is merged on the server as a duplicate, its time entries move to the remaining, non-approved time log.
- Sum per task and employee = „Ist-Aufwand“ (actual effort) in the „Ressourceneinsatz“ (resource usage) (Employee usage); sum per time log × hourly rate = actual personnel costs on approval (Actual personnel costs).
All hour totals of the time log (Work) are computed from time entries.