Reference & Data Model
Timer (timer)
A timer is a stopped, measured time span with date, start and end time that has not yet been assigned to a time log.
Purpose
Section titled “Purpose”The timer is the intermediate stage between measuring and logging. It remembers the time span until the user assigns it to a project or discards it. (Transactional data)
Where in the app
Section titled “Where in the app”Workmanagement › Zeiterfassung › Erfassungsansicht, day and week view: timers of the selected day appear as separate rows with duration and time span. Right after stopping, the dialog „Zeit erfasst“ (Time recorded) appears with weekday, duration, „Runden“ (Round: „Exakt“, „5 min“, „15 min“), „Notiz“ (Note) and the buttons „Verwerfen“ (Discard) / „Speichern“ (Save) (Guides › Time tracking).
Fields
Section titled “Fields”| Field | Technical | Type | Required | Meaning | Notes |
|---|---|---|---|---|---|
| Date | date |
Date | yes | Day of the timer | System: start day |
| Start time | start_time |
Time | yes | Start | System: start time |
| End time | end_time |
Time | yes | End | System: stop time; „Runden“ rounds up to the next 5- or 15-minute step |
| Note | note |
Text | no | „Woran hast du gearbeitet?“ (What did you work on?) | Can only be entered in the dialog „Zeit erfasst“; not shown afterwards |
Shown, not stored: duration (end time − start time). Only your own timers are visible (filter on the creator).
Relations
Section titled “Relations”No references to other entities.
States
Section titled “States”No status field. A timer exists until it is converted, discarded or deleted.
Rules & automation
Section titled “Rules & automation”- „Verwerfen“ in the dialog „Zeit erfasst“ deletes the timer; closing without saving keeps it exactly as measured.
- „Neuen Zeiteintrag aus Timer erstellen“ (Create new time entry from timer) opens „Neue Zeiterfassung“ with date and time span prefilled; after saving, the timer is deleted.
- „Zu vorhandener Zeiterfassung hinzufügen“ (Add to existing time log) lists your own, not yet approved time logs of today; the time span is appended as a Time entry and the timer is deleted.
- „Timer löschen“ removes a timer without assigning it.
- A timer spanning midnight shows a duration of 0 (negative values are clamped to 0).