Strategy & prioritization

KPIs of the portfolio prioritization: rank, success probability, target and risk contribution, and the charts of the strategy view.

All values on this page are calculated in the view.

KPI MP PF PG PJ Where Meaning Calculation Display
Prioritization / prio score („Priorisierung“ / „Prio-Score“) ✓ ✓ ✓ PF: Strategy › table (rank changeable by dragging), strategy fit „Top-Priorität“, Preparation › column, profile cards; PG: Profile › badge/quick stats, Planning objects › column; PJ: Profile › header Manually assigned rank from the portfolio prioritization Project: field prioritization_rank. Program: Ø of the child projects (0 decimals); 0 projects → „NaN“ (PG profile) or „-“ (table) Number · badge
Success probability („Erfolgswahrscheinlichkeit“) ✓ ✓ ✓ PF: Strategy › table „Erfolg (%)“ + footer Ø, radar, profile cards; PG: Profile, project cards; PJ: Profile › header Manually maintained success probability Direct field success_probability_in_pct (project or program), 0 decimals; 0/empty → „-%“; radar sets programs to 0 %
Target contribution („Zielbeitrag“) ✓ ✓ PF: Strategy › table (+ Ø footer), priority matrix (X), strategy fit › card 1; PJ: Profile › header, Insights › „Ziel- & Risikobeitrag“ Weighted share of fulfilled portfolio targets Only assessments of active portfolio targets: Σ weighting of the „Ja“ answers ÷ Σ weighting of all assessed × 100; nothing assessed → 0. Program: assessments of all sub-projects pooled % · bar (0–100) / number
Risk contribution („Risikobeitrag“) ✓ ✓ PF: Strategy › table (+ Ø), priority matrix (Y); PJ: Profile › header, Insights Weighted share of affirmed risk criteria (higher = more risk) Like target contribution over active risk criteria and their assessments %
Ø portfolio (target contribution) („Ø Portfolio“) ✓ Portfolio › Scoreboard › strategy fit › card 1 Unweighted average of the target contributions Σ target contribution ÷ number of top-level elements % · dashed line
Top priority („Top-Priorität“) ✓ Portfolio › Scoreboard › strategy fit › card 3 Five elements with the highest prio score Project: rank; program: Ø of the sub-projects; top 5 descending Ranking list + number
Priority matrix („Prioritätsmatrix“) ✓ Portfolio › Strategy › card 1 Positioning by strategy fit X = target contribution, Y = risk contribution (0–100); bubble size = benefit (program Σ children) Scatter plot
Costs vs. benefit (bars) („Kosten vs. Nutzen“) ✓ Portfolio › Strategy › card 2 Outflows and inflows per element Left (negative): total costs (prioritization), probable damage; right: order volume (with an order) otherwise benefit, probable success; order by rank € · stacked bars
Radar („Gesamtkosten“ / „Auftragsvolumen“ / „P(Schaden)“ / „P(Erfolg)“ / „Erfolg“ / „Dauer“) ✓ Portfolio › Strategy › card 3 Comparison of the selection relative to the respective maximum Axes: total costs (prioritization), order volume, probable damage/success, success probability (program 0), duration in calendar years Radar (6 axes)
Σ total (prioritization footer) („Σ Summe“) ✓ Portfolio › Strategy › table › footer (selection or all) Aggregate of the selected elements Σ value = Σ expected income − Σ total costs; ROI = Σ value ÷ Σ costs × 100 (0 at costs 0); Σ benefit, Σ order volume, Σ costs, Σ P(damage)/P(success); Ø target contribution/risk contribution/success (unweighted, success incl. programs); Ø duration; Σ effort € / % / d / h
Criteria › weighting („Kriterien › Gewichtung“) ✓ Portfolio › Criteria (target and risk criteria) Relative weight of a criterion in the target/risk contribution Attribute „{n}x“; status Aktiv/Inaktiv (inactive ones do not enter) Number + badge
Value vs. risk (scatter plot) („Wert vs. Risiko“) ✓ Portfolio › Scoreboard › „Balance“ Position of the top-level elements by value and expected damage X = probable damage, Y = value (prioritization), bubble size ∝ total costs (prioritization); labels only for top 3 by value € axes · bubbles
  • Target contribution without assessment shows 0 %, not „—“. A project without assessments is therefore indistinguishable from a project with nothing but „Nein“ answers.
  • Priority matrix: the bubble size is the benefit from the profile, not the expected income. A project with an order but without benefit is the smallest bubble.
  • Footer: „Ø Erfolg“ also averages programs, the radar sets programs to 0; footer ROI shows „0 %“ at costs 0, rows „–“.
  • Program profile shows „NaN“ as prioritization at 0 projects.

See Portfolio target, Risk criterion, Guides › Strategy, Guides › Criteria.